A lot has happened during the last week. Each day almost five or six different guys have been here working on the house.
Enrique the electrician stopped by the house and installed all f the switches. I installed our hanging lights. They look awesome.
The heating system is up and running. We are enjoying nice warm temperatures inside the house! Nate the heating system reviewer is here to evaluate the system and verify it is up to code.
The bathroom is almost finished. We need to install some outlets, mount door pulls, and build a small cabinet for our towels. Other than that, it is completely functional and looks beautiful! We are now taking showers indoors.
We have moved into the bedroom. It is 100% complete. It is the first room in the house to be totally done.
The table we ordered came in and it looks awesome!
The crew is now working on the back patio and it should be complete within 2 days. I will send more photos later but we are very busy moving back into the house.
After spending six months outdoors I have forgotten how warm indoors can be. Sleeping in our bedroom is just like staying at Ponte, the winery in Temecula. It is beautiful and luxurious!